Plant nursery construction

Project namePlant nursery construction
Industry classificationAgriculture
Basic information about the project
Project essenceWithin the framework of the project it is planned to build a nursery of plants from open and closed ground.
Project capacityOn the territory of the kennel will be placed: - greenhouses; - administrative building with an khozyaystvennym unit; - a trading platform with a pavilion; - demonstration garden park
Consumer market descriptionresidents of the resort city of Anapa
Object construction term1.00
Competitive advantage- a successful location, both in terms of soil quality, and in terms of further implementation of planting material; - a wide range of products; -high quality of planting material; -use of modern technologies of cultivation and equipment for this.
Resource availability for project realizationSubject resources provided
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh0.10
Planned volume of gas consumption (annual), million cubic meters0.00
Planned volume of water consumption (annual), million cubic meters0.14
Degree of project developmentDeveloped business-plan
Financial estimation of the project
Total cost of the project, mln rubles171.70
Own resources, million rubles0.00
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles171.70
Conditions of investor participationDirect investments
Form of investments returnFinancial
Payback period4.50
Basic indicators of investment project economic efficiency
Net present value (NPV)223.80
Simple payback time4.25
Discounted payback period4.50
Internal rate of return (IRR)41.00
Productivity index (PI)2.61
Income per year 381.90
Social efficiency of investment project
Number of workplaces41
Salary average level (thousand rub per year)257.40
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles74.30
which includes into consolidated budget of the krai, million rubles30.60
General information about the ground area
Address of the areaAnapa city-resort, s. Yurovka, v 15 m na sever ot zemel'nogo uchastka po ul. polkovnika Shurenkova, 17
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23:37:0501001
Declared area (m2)9972.00
Limit size of the area (m2)9972.00
Land categoryLands of inhabited localities
Kind of allowed useAgricultural activity
Actual useNot used
Availability of buildings, structures, constructionsNo
Permits, town-planning documentationTown-planning conclusion
Information about proprietor (right holder)
ProprietorMunicipal unity Anapa city-resort
Right holderMunicipal unity Anapa city-resort
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationNo
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)PS 110/10/ kW
Power supply center (electrotension class)Another
Power supply center (free power (MWt))0.00
Power supply center (distance(m))100.00
Nearest connection point (network tension, kV)34.61
Nearest connection point (distance(m))0.00
Gas-supplying
Gas pipeline (name, right-holder)Not provided
Gas pipeline (diameter(mm))0.00
Gas pipeline (pressure(MPa))Another
Gas pipeline (carrying capacity(cube. m.in a year))0.00
Gas pipeline (distance(m))0.00
Nearest connection point (diameter(mm))0.00
Nearest connection point (pressure (MPa))Another
Nearest connection point (carrying capacity (cubic meter a year))0.00
Nearest connection point (distance(m))0.00
Water-supply
Water supply source (name, right-holder)The existing water supply system
Water supply source (power (cubic meters a day))0.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))0.00
Nearest connection point (power (cubic meters a day))0.00
Nearest connection point (diameter(mm))0.00
Nearest connection point (distance(m))0.50
Sewage system
Type of building (name, right-holder)Local treatment facilities
Type of building (power (cubic meters a day))0.00
Type of building (distance(m))0.00
Nearest point of connection (power (cubic meters a day))0.00
Nearest point of connection (diameter(mm))0.00
Nearest point of connection (distance(m))0.00
Installation of telephones/internet
Central network (distance(m))0.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub22.30
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation Anapa city-resort42.00
nearest settlement Anapa city-resort0.00
Center of federal subject Krasnodar city160.00
highways (regional, federal value) Federal highways M-2516.00
highways of local value -0.00
nearest railway station Railway station «Anapa»32.00
nearest railway Railway lines6.10
airport Anapa airport38.00
seaport seaport Anapa44.00
Additional information about the ground area
Special conditionsThe land is flat
Cost of rent/buy of the ground area, mln. rub0.10
Geographical coordinates of object (dd.dddddd)
Latitude (N)45.118505
Longitude (E)37.393571
NotesNo
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameAdministration of municipal formation Anapa city-resort
Postal addressKrasnodarsky region, Anapa city-resort, Krimskaya street, 99, 353440
Sitewww.investanapa.ru
Phone/fax8(86133) 5-26-66
E-mail addressNo
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipal formation Anapa city-resort
Postal addressKrasnodarsky region, Anapa city-resort, 99, 353440
Sitewww.investanapa.ru
Phone/fax8(861-33) 5-26-66
E-mail addressue@anapa-official.ru
Executive (Full name, work position, phone number)Tsvetkova Ekaterina Valer’evna, chief leading specialist of department of economy and investments, phone:(86133)52666